Balco Hay: off-grid solar and battery power for the Wannamal site

An AC-coupled solar and battery expansion for the accommodation camp at Balco’s Wannamal production facility, built on the existing infrastructure without affecting site reliability, and ready for more dongas.

Finished rooftop solar array on a transportable building, with another solar-roofed building and open paddock behind.
Finished rooftop solar array on a transportable building, with another solar-roofed building and open paddock behind.
LocationWannamal, north of Perth, WA
CustomerBalco, a large hay producer and exporter with multiple sites around Australia. Wannamal is one of its off-grid production facilities.
SystemAC-coupled solar and battery expansion for the accommodation camp: 48.45 kW of rooftop solar, 125 kW of inverter capacity and 100 kWh of battery storage
EquipmentSAJ CHS2 50 kW all-in-one battery and inverter cabinet, SAJ C6 75 kW PCS (125 kW total), SAJ 100.3 kWh high-voltage battery, SAJ E-Manager energy controller, 102 × Risen 475 W panels (RSM96-11-475BNDG)
CompletedInstalled May 2026

Gallery

On site at Wannamal

The challenge

Growing demand on an off-grid production site

Balco’s Wannamal production facility has no mains connection. It runs on a 1.1 MW generator, supported by an existing 500 kW solar system set up to peak-shave for the generator, and carries a lot of specialised equipment, including presses and direct-on-line motor loads. The accommodation camp ran off this main system but had its own supporting system, isolated so it could revert to the main system if needed, plus its own backup generator.

Demand had grown. The camp system still had usable life, but compatible equipment to expand it was significantly more expensive and lacked the benefits of current technology. Balco wanted to build on what it had without changing how the site operates, so we targeted the uncovered load and modelled likely future loads.

What we did

A microgrid that works with what was there

Our team inspected the site several times and modelled the remaining and expected future loads. Rather than replace equipment that still had life in it, we used the existing infrastructure and AC-coupled the expansion. We prepared the scope of works, the single line diagram, the delivery plan and the system operation plan before anything was ordered.

  • Solar on the dongas: We spread rooftop solar across four dongas, so no extra land was needed.
  • Battery and inverters: We installed an SAJ CHS2 50 kW cabinet with a 100.3 kWh high-voltage battery, an SAJ C6 75 kW PCS and an SAJ E-Manager to run the system as one microgrid.
  • Working with what was already there: We AC-coupled the new system to the existing camp system and connected the existing AC supply to the inverter’s generator port, so the new system works safely alongside the existing system and the main site supply. A manual changeover switch lets the microgrid be isolated or run straight off the main supply or generator if needed.
  • Room to grow: We built a new switchboard to distribute power, with connections ready for three more dongas.

The expansion adds an extra layer of power without affecting site reliability, while the existing system is still used to its full benefit. The accommodation and units now have a single, centralised main power supply that runs on solar and battery first, with the main site’s larger supply available on demand to supplement any needs. Our crew installed the system in a single week in late May 2026.

Thinking of going off-grid? Read the independent consumer guides from the New Energy Tech Consumer Code first: Installing solar · Installing batteries · Going off grid

Project package

Equipment and electrical scope

CategoryEquipmentQtyTotal
Solar panelsRisen 475 W (RSM96-11-475BNDG)10248.45 kW
Battery inverterSAJ CHS2-50K-T6 all-in-one cabinet150 kW
Additional inverterSAJ C6 75 kW PCS175 kW
BatterySAJ high-voltage battery (in CHS2 cabinet)1100.3 kWh
Controller / EMSSAJ E-Manager1Microgrid control
BackupExisting site generator (retained, not supplied)–Generator port connection
MountingS-5! mounting on Trimdek, four donga roofs––

Electrical scope

  • Several site inspections and modelling of remaining and future loads
  • Scope of works, single line diagram, delivery plan and system operation plan prepared before ordering
  • New distribution switchboard with connections ready for three more dongas
  • Existing AC supply connected to the inverter’s generator port, with energy management set up so no dry-contact signal is needed (resolved a back-feed issue with the existing system)
  • Manual changeover switch to isolate the microgrid or run straight off the generator
  • DC and AC cabling between the donga arrays, cabinet and switchboard
  • Earthing, protection and isolation
  • Commissioning and testing, installed in a single week in late May 2026

No pricing shown.

The results

What the site is getting

~75 MWhEstimated solar generation per year
~60%Estimated share of the accommodation load supplied by solar
~16,000 LEstimated generator diesel avoided per year for the camp load
~9 hrsEstimated overnight battery supply at typical evening load
Ready to growconnections ready for three more dongas

Figures marked ‘Estimated’ are modelled estimates, not measured results. They are based on the installed solar size, typical solar yields for the Wannamal area and an assumed accommodation load, as no metered load data was available. Actual results depend on weather, site usage and how the system is operated.

Take it with you

Download the case study (PDF)

A print-ready A4 summary, with project photos, of the Balco Hay project. Every copy, printed or shared, carries a QR code that links back to this page.

PDF · 5 pages · A4 · includes project photos

QR code to this page

nationalrenewable.com.au/projects/balco-hay

QR encodes the page URL + ?utm_source=qr&utm_medium=print&utm_campaign=case-study so scans show up in Google Analytics.

Related projects

More projects across WA

Elevated view of solar panels on two roof sections of a farm building.
Elevated view of solar panels on two roof sections of a farm building.
★ Case study
Business

Buckland Estate

Buckland, near Northam · Avon Valley

A wedding venue rewired from a new main switchboard, with about 98.3 kW of solar, 200.6 kWh of battery storage, a 220 kVA generator and the grid kept available for emergencies.

SolarBattery
Designed to run mainly on solar and battery, with generator and grid backup

August 2026

Rows of ground-mounted solar arrays on a grassy hillside, with a steel cable tray in the foreground.
Rows of ground-mounted solar arrays on a grassy hillside, with a steel cable tray in the foreground.
★ Case study
Business

Wise Winery

Eagle Bay, near Dunsborough · South West

About 258 kW of new solar and about 282 kWh of usable battery: a ground mount and rooftop array at the main winery, plus off-grid systems for the back shed and Wise Winery House.

SolarBatteryOff-grid
About 85% self-sufficient in August 2026 (main winery site)